Bloomfield FAQ
Answers for Bloomfield business owners, landlords and homeowners.
Commercial work, permits, fees, opening a business, rental and sale inspections, houses and heating.
Does MDL do commercial electrical work in Bloomfield, NJ?
Yes. MDL Electric Cooling & Heating troubleshoots, repairs and wires stores, offices, restaurants and apartment buildings in Bloomfield, as well as houses. It holds New Jersey electrical contractor license 34EI01606200 and electrical business permit 34EB01606200. It works from 4 Harrison Avenue in West Orange, about 2.3 miles in a straight line from the center of Bloomfield. Call 973.809.2339 or send the form with the address, what the building is used for and what needs to be done.
Who issues electrical permits in Bloomfield, and how do I book an inspection?
The Bloomfield Construction Department at 1 Municipal Plaza, First Floor, Room 105 (973-680-4053). It issues permits for residential, commercial and industrial construction, inspects the work and issues final approvals and certificates of occupancy. Inspections are scheduled by calling 973-680-4053. On November 15, 2026 the Township listed online inspection requests as coming soon. Permit and inspection status is on the Township's SDL portal, which requires registration.
Does a Bloomfield store or office need a permit for new circuits or lighting?
Usually. Swapping an outlet, switch or light fixture for a like one is ordinary maintenance with no permit. The exception is a fixture with an emergency battery pack (N.J.A.C. 5:23-2.7). New circuits, new wiring and panel work go through the Construction Department. Renovation work in an office, store, factory or storage building may count as minor work. Minor work starts after notice, and the permit application follows within five business days (N.J.A.C. 5:23-2.17A). The five-outlet shortcut applies only to one- and two-family homes.
What does Bloomfield charge for an electrical permit?
Bloomfield's fee ordinance of May 19, 2025 sets a $90 minimum for each subcode, and plan review adds 20% of the permit fee. On the electrical side it charges $90 for up to 20 receptacles, fixtures, switches or detectors, and $25 for each further 20. A panel costs $90 up to 200 amps, $160 to 400 amps, $300 to 1,000 amps and $500 above that. Site lighting is $125 for one to five poles. These are Township fees, not MDL prices. MDL does not publish a price; it gives a written quote after it has seen the building.
I am opening a business in a Bloomfield storefront. What comes first?
The Township's Zoning Prerequisite for Change of Use or Occupancy. If you are applying for a certificate of occupancy to open a new business, the form asks for a copy of the lease. The application fee is $40, with $85 due on zoning approval. The zoning officer, health officer, fire subcode official and building subcode official sign it, and any interior work needs construction permits. The form must be returned before you occupy the space, and it sets a $500-per-day penalty for failing to comply. Restaurants, cafes, barber and beauty shops, and child care centers also need a Board of Health permit before they open.
What do Bloomfield landlords need before a rental inspection?
A Rental Property Registration for every rental unit, under Town Code Chapter 431, adopted May 19, 2025. Fire Department inspectors check each unit every three years and at every change of tenant, before the new tenant moves in. The fee is $60 per unit. The Fire Department's notice says ten-year sealed battery smoke alarms may not replace hardwired alarms. Carbon monoxide alarms are required near sleeping areas where there are fuel-burning appliances or an attached garage. MDL replaces hardwired alarms and corrects the electrical items an inspection lists.
Does MDL work on houses in Bloomfield too?
Yes. In Bloomfield houses MDL handles electrical repairs, panel and service upgrades, and knob and tube replacement. It also installs EV chargers, generators, smoke and carbon monoxide alarms and lighting. The Census Bureau counts 8,213 Bloomfield homes built in 1939 or earlier, 37.7% of the total. The age of the wiring is worth knowing before a project.
What does Bloomfield's sale inspection check on the electrical side?
Bloomfield's Transfer of Property Title (TOP) checklist has four electrical items. There must be no exposed wiring. All outlets and switches must have covers. Breaker and fuse boxes must be secured, with no open knockouts or missing uncovered breakers. The electric service must be secure and in good order. Smoke and carbon monoxide alarms are checked on each floor and near the bedrooms. Every construction permit, past and present, must be closed before a TOP is issued. The application is a Fire Department form, due 30 days before closing, and a TOP is valid for six months. The fee is $200 for a single-family house, $260 for a two-family and $320 for a three-family. Non-residential buildings pay $315 to $1,250 by size. Questions about the inspection go to the Fire Department at 973-680-4153.
Can MDL handle heating and cooling at the same Bloomfield property?
Yes. MDL holds a New Jersey master HVACR contractor license (19HC00308200) as well as its electrical contractor license (34EI01606200). Equipment that will not run and the circuit that feeds it can be checked on the same visit. MDL confirms it covers the exact equipment before it schedules. See MDL's AC repair, heating repair, boiler service, commercial HVAC and commercial boiler repair pages.