24/7 electrical, heating, and cooling help across North Jersey

Call 973.809.2339

Holiday lighting · Essex County

Holiday and Christmas light installation in West Orange and Essex County, NJ

MDL Electric, a licensed electrician in West Orange, hangs, powers and times your holiday lights and takes them down in January. Published installer prices run $250 to $1,500 for a basic roofline and $5 to $12 per foot (HomeGuide); the national average is $450 (Fixr).

Two-story house outlined in warm white lights with a green-lit tree and a purple-lit shrub in a snowy yard at night

The short answer

Who hangs Christmas lights near West Orange, and what does it cost?

MDL Electric Cooling & Heating, at 4 Harrison Avenue in West Orange, hangs, powers and times holiday lights for homes across Essex County, and takes them down in January. Call 973.809.2339 with your town, the number of stories and roughly how many feet of roofline you want lit. Published installer prices run $250 to $1,500 for a basic roofline package, or $5 to $12 per linear foot (HomeGuide, updated October 1, 2025); the national average is $450 (Fixr, updated January 31, 2025). See the price table. These are market ranges, not an MDL quote.

MDL is a licensed New Jersey electrical contractor (34EI01606200). That matters because the risky part of holiday lighting is the power: NFPA says electrical distribution or lighting equipment was involved in 40% of home Christmas tree fires. MDL puts the lights on an outdoor GFCI outlet with a weatherproof in-use cover, adds a timer, and keeps every circuit under its load (why an electrician).

Need an outlet where there is none, a dedicated circuit for a big display, or wiring for a permanent track system? That is ordinary electrician's work for MDL (outlets, circuits and timers).

Your townWest Orange, Montclair, Livingston, Maplewood, South Orange or anywhere in Essex County.
Stories and rooflineOne story or two, and roughly how many feet of eaves, plus any trees or shrubs.
Your lights or new onesWhether you already own outdoor-rated LED strings or want MDL to supply them.
Where the power isHow many outdoor outlets you have, and whether one trips when the lights go on.

What you get

What MDL's holiday light installation includes.

One visit to hang and power the display, one visit in January to take it down. Everything between is on a timer.

Warm white icicle lights hung along the eaves of a shingled gable at night, with a lit tree behind the house
Stock photo for illustration (Spencer Gurley Films, Pexels), not an MDL job. Lights clipped along the eaves, the most common roofline outline.
  • Hanging, with clips, not staples. Roofline, gutters, railings, windows and doorways, plus trees and shrubs. Clips come off clean in January; staples and nails pierce the cord insulation and the shingles.
  • Outdoor-rated, listed lights only. The NEC requires decorative holiday lighting to be listed by a recognized lab (UL 588 covers seasonal light strings), and lights used outdoors must be listed for outdoor use.IAEI
  • Power from a GFCI outlet with a weatherproof cover. Not an extension cord through a window. Outdoor receptacles at a home must be GFCI protected and have an enclosure that stays weatherproof with the plug inserted.EC&M; NC OSFM
  • No overloaded circuits. MDL adds up the strings and splits them across outlets and circuits. The CPSC rule of thumb: never string together more than three sets of incandescent lights.CPSC
  • A timer or smart plug. Lights come on at dusk and go off at a set hour, so nobody is outside in the cold unplugging cords.
  • Takedown in January. The NEC allows temporary power for holiday lighting for up to 90 days; HomeGuide says most installers recommend takedown by mid-January.EC&M; HomeGuide

Cost

What Christmas light installation costs: published ranges, not an MDL quote.

Read October 28, 2026 from HomeGuide's cost guide (updated October 1, 2025), HomeGuide's New York installer page and Fixr (updated January 31, 2025). None of these is an MDL price. Call MDL for a price on your house.

Scroll sideways to see the whole table.

Published holiday light installation prices. Sources: HomeGuide cost guide (October 1, 2025), HomeGuide New York installers and Fixr (January 31, 2025), read October 28, 2026. Not MDL prices.
WhatPublished priceSource
Basic roofline package$250 to $1,500HomeGuide
Full package: roofline, windows, garage, landscaping$750 to $5,000HomeGuide
Per linear foot, installed$5 to $12 (HomeGuide); $2.50 to $5.00 for lights and labor (HomeGuide New York page)HomeGuide
National average job$450; most jobs $250 to $650Fixr
One-story home$250 to $2,400HomeGuide
Two-story home$500 to $3,600; about 20% more than one storyHomeGuide
Three-story home$750 to $5,000HomeGuide
High or hard roofs, about 16 feet and up$3.50 to $6 per footFixr
Hourly, with a minimum$50 to $75 per hour, $150 to $200 minimumHomeGuide New York page
Takedown only$100 to $400 (HomeGuide); $125 to $350, or $0.50 to $0.65 per foot (Fixr)HomeGuide; Fixr
New outdoor outlet$120 to $200 eachFixr
Timer installed$60 to $100 per hour to install; timers $12 to $50 eachFixr
Permanent holiday lighting$20 to $40 per foot, $2,000 to $8,000 for 100 to 200 feet (HomeGuide); $3,000 to $3,500 average (Fixr)HomeGuide; Fixr
  • Feet of roofline drive the price. HomeGuide says a mid-sized home needs 100 to 300 feet of lights; a basic single-story outline needs 50 to 200 feet. At $5 to $12 a foot, 100 feet is $500 to $1,200 and 200 feet is $1,000 to $2,400.HomeGuide
  • Stories and steep roofs cost more. Taller ladders and more risk. HomeGuide's New York page says fees are 20% more for homes with two or more stories or steep roofs; Fixr says multi-level or hard-to-reach eaves add 20 to 25%.HomeGuide; Fixr
  • Your own lights save money, if they are outdoor-rated. Fixr says labor is about 65% of a job and materials about 35%. Strings you already own bring the price down; strings that are damaged or indoor-only do not get hung.Fixr
  • Ask what takedown includes. HomeGuide says removal is sometimes in the package price. Confirm the takedown date and whether the lights are stored or handed back.HomeGuide

Why an electrician

The lights are easy. The power behind them is where the fires and shocks come from.

What the National Fire Protection Association, the Consumer Product Safety Commission and the National Electrical Code say, and what MDL does about each one.

  • 40% of Christmas tree fires involve electrical equipment. NFPA says electrical distribution or lighting equipment was involved in two in five home Christmas tree fires, and nearly one in four (24%) were started by lamps or bulbs. US fire departments answered an average of 143 home Christmas tree fires a year from 2020 to 2024, with 7 deaths, 13 injuries and $15 million in damage, plus 835 fires a year that began with other decorations.NFPA
  • 18,400 decorating injuries in one season, most from falls. CPSC counted 18,400 emergency-room injuries from holiday decorating between November 2016 and January 2017, about 200 a day. Falls caused 38%, cuts 14% and strains 18%; two deaths were falls from ladders. A crew that hangs lights for a living, with the right ladders, is the safer way onto a West Orange roofline in November.CPSC
  • Outdoor outlets must be GFCI protected and covered. The NEC (210.8(A)(3)) requires GFCI protection for a home's outdoor receptacles, and 406.9(B) requires an enclosure that is weatherproof whether or not the plug is inserted, the "in-use" bubble cover. CPSC says to plug outdoor lights only into a GFCI-protected outlet or a portable GFCI.EC&M; NC OSFM; CPSC
  • Holiday lighting power is temporary: 90 days. NEC 590.3(B) permits temporary electrical power for decorative holiday lighting for up to 90 days, after which it comes down. New Jersey adopts the 2020 NEC as its electrical subcode (N.J.A.C. 5:23-3.16).EC&M (Mike Holt); N.J.A.C. 5:23-3.16
  • The lights and cords must be listed, and outdoor cords must be wet-rated. NEC 590.5 requires holiday decorative lighting to be listed (UL, CSA or ETL; UL 588 is the standard for seasonal light strings). Extension cords used outdoors must be listed for wet locations, the "W" marking, and the NEC bars running cords through windows, doors or walls or attaching them to the building as a substitute for wiring.IAEI
  • Three strands, then stop. CPSC says never to string together more than three sets of incandescent lights and never to overload outlets; inspect every set for cracked sockets, frayed wire and loose connections, and throw damaged sets away.CPSC Holiday Safety; CPSC release
  • 24,000 home electrical fires a year. The U.S. Fire Administration counts about 24,000 residential electrical fires a year, with misused extension cords and overloaded circuits among the common causes.IAEI, citing USFA

A breaker that trips every time the display comes on is a sign the circuit is already full, not a nuisance to reset. That is a job for electrical repair, and sometimes for a panel upgrade.

Outlets, circuits and timers

Adding an outdoor outlet, a dedicated circuit or a timer for the lights.

The part of holiday lighting that only a licensed electrician can do, and what New Jersey's permit rules say about it.

  • A new outdoor GFCI outlet where the lights plug in. Weather-resistant receptacle, GFCI protection, an in-use cover, placed at the corner of the house or under the eave so no cord crosses a walkway. Fixr lists extra outlets at $120 to $200 each, not an MDL price.Fixr
  • A dedicated circuit for a big display. Inflatables, a wrapped tree line and a two-story roofline can add up to more than one 15-amp circuit should carry. A circuit of its own from the panel ends the tripping.
  • A timer or smart switch on that circuit. Fixr puts timers at $12 to $50 each with an installation fee of $60 to $100 per hour, and electricians at $40 to $120 an hour, not an MDL price. Set once in November, ignored until January.Fixr
  • New Jersey calls this minor work. Under N.J.A.C. 5:23-2.17A, installing five or fewer outlets where the existing circuits and service can carry the load is minor work: no permit is required before the work starts, but the contractor gives the local enforcing agency notice first, files the permit application within five business days, and the town inspects within three business days of the request. Replacing an existing receptacle with one of the same voltage is ordinary maintenance, with no permit or notice; upgrading the circuit behind it is minor work.N.J.A.C. 5:23-2.17A; NJ DCA Construction Code Communicator, Spring 2021
  • Plug-in gear needs no permit at all. The NJ Uniform Construction Code does not require a permit for cord-and-plug-connected equipment that plugs into an existing receptacle, so your light strings, plug-in timers and inflatables are fine as they are.NJ DCA, Spring 2021
Electrician's hands tightening a terminal screw on a pair of open receptacle boxes set in a white wall
Stock photo for illustration (Ksenia Chernaya, Pexels), not an MDL job. A new outlet for the lights is minor work under New Jersey's code: notice first, permit application within five business days.

LED or incandescent

What the lights cost to run, and how many strands one outlet can take.

Two things homeowners ask before the lights go up: what they add to the electric bill, and how many strands one outlet can safely carry. Both answered with published numbers.

Bundles of warm incandescent mini-light strands glowing while they hang against a concrete building at dusk
Stock photo for illustration (Ahnaf Piash, Pexels), not an MDL job. Incandescent minis: CPSC says no more than three sets joined end to end.
  • LED strings use 92% less energy. ENERGY STAR says certified decorative light strings consume 92% less energy than conventional incandescent strands, last up to 10 times longer and run cool to the touch.ENERGY STAR
  • So the bill barely moves. HomeGuide says a medium-sized LED display run 6 to 8 hours a night costs just a few dollars for the whole season. Fixr puts holiday-light energy costs at $5 to $75 a month, with the high end for large incandescent displays.HomeGuide; Fixr
  • Incandescent: three sets, then a new outlet. CPSC's rule is never more than three sets of incandescent lights end to end. LED strings allow more; the box or tag says how many.CPSC
  • How many strands a house takes. HomeGuide's New York page says a basic exterior needs 10 to 20 strands of 14 to 16 feet, limited by the house's electrical system. That limit is what MDL checks first.HomeGuide
  • Professionals use commercial-grade LEDs. HomeGuide says incandescent bulbs are rarely used by professionals; commercial-grade LEDs cost more up front, use less power and last longer.HomeGuide

Permanent holiday lighting

Permanent track lighting: the wiring is the electrician's half.

Track systems with color-changing LEDs under the eaves stay up all year and run from a phone app. The track is a product; the power feed behind it is electrical work.

  • What it costs. HomeGuide puts permanent Christmas lights at $20 to $40 per linear foot, or $2,000 to $8,000 for 100 to 200 feet; Fixr's average is $3,000 to $3,500. Not MDL prices.HomeGuide; Fixr
  • Why it pays back. HomeGuide's New York page says that if you pay for professional installation every year, permanent lighting pays for itself after a few years, and the lights can change color for other holidays.HomeGuide
  • What MDL wires. A permanent system needs a weatherproof power supply and controller on a circuit that can carry it, mounted where the app's controller gets a signal. That feed, its outlet or hardwired connection, and the inspection are MDL's work. Ask when you call whether MDL will supply and mount the track itself or wire a track you buy.
  • The downsides, plainly. A visible track on the fascia in daylight, a controller tied to one brand's app, the up-front cost above, and a 90-day rule that no longer applies because the system is permanent wiring, installed and inspected as such.

When to book

Book in early November for lights up before Thanksgiving.

What the installer market says about timing, read October 28, 2026.

01

Early November

Book. HomeGuide says most homeowners install after Halloween or in mid-November; dates fill from the front.

02

Install day

HomeGuide: 2 to 5 hours for most homes, up to 2 days for large properties or complex layouts.

03

December

The timer runs the show. A string that goes dark is a call to MDL, not a trip up the ladder.

04

January

Takedown. HomeGuide: most people remove lights in the first week of the new year, installers return 2 to 4 weeks after New Year's; the NEC's temporary-power limit is 90 days.

Sources: HomeGuide New York installers, HomeGuide cost guide, EC&M on NEC 590.3(B).

Where MDL works

Holiday light installation across Essex County, from a West Orange base.

MDL works from 4 Harrison Avenue in West Orange. These Essex County towns have their own MDL service-area page. MDL also lists Morris and Union County towns.

Holiday lighting

Lights up before Thanksgiving, down in January. Call MDL.

Call or send the form with your town, the number of stories, roughly how many feet of roofline, and whether you have outdoor outlets.

Holiday lighting questions

Straight answers on cost, outlets, permits, LEDs and timing.

Prices are other companies' published ranges, not an MDL quote; code rules come from the National Electrical Code and New Jersey's Uniform Construction Code; safety numbers from NFPA, CPSC and ENERGY STAR.

Who installs Christmas lights near West Orange, NJ?

MDL Electric Cooling & Heating, at 4 Harrison Avenue in West Orange (973.809.2339), hangs, powers and times holiday lights for homes in West Orange, Montclair, Livingston, Maplewood, South Orange and the rest of Essex County. MDL is a licensed New Jersey electrical contractor (34EI01606200), so the outlets, timers and circuits behind the lights are done to code too.

How much does it cost to have lights put on your house for Christmas?

HomeGuide's cost guide (updated October 1, 2025) puts a basic roofline package at $250 to $1,500 and a full package with windows, garage and landscaping at $750 to $5,000, or $5 to $12 per linear foot installed. Fixr (updated January 31, 2025) puts the national average at $450, with most jobs between $250 and $650. These are published market ranges read October 28, 2026, not an MDL quote.

How much do Christmas light installers charge per foot?

HomeGuide's cost guide says $5 to $12 per linear foot installed. Its New York installer page lists $2.50 to $5.00 per foot for lights and labor, with fees about 20% higher for two-plus stories or steep roofs. Fixr says high or hard roofs of about 16 feet or more run $3.50 to $6 per foot. Not MDL prices.

Does the price include taking the lights down?

Often, but ask. HomeGuide says removal is sometimes included in the package price and costs $100 to $400 on its own; Fixr lists removal at $125 to $350 per project or $0.50 to $0.65 per linear foot. Ask MDL for the takedown date and price when you book.

Do Christmas lights make your electric bill high?

LED strings do not. ENERGY STAR says certified LED light strings use 92% less energy than conventional incandescent strands and last up to 10 times longer. HomeGuide says a medium-sized LED display run 6 to 8 hours a night costs just a few dollars for the whole season; Fixr puts holiday-light energy costs at $5 to $75 a month depending on the display.

Why hire an electrician instead of a handyman to hang Christmas lights?

Because the dangerous part is the power, not the clips. NFPA says electrical distribution or lighting equipment was involved in 40% of home Christmas tree fires, and nearly one in four started with lamps or bulbs. The National Electrical Code requires outdoor receptacles at homes to be GFCI protected and to have an in-use weatherproof cover, limits temporary holiday lighting power to 90 days, and requires the lights to be listed. A licensed electrician checks the circuit load, the outlet and the cords before anything is plugged in.

How many strands of Christmas lights can I plug in together?

The U.S. Consumer Product Safety Commission says never to string together more than three sets of incandescent lights and never to overload electrical outlets. LED strings draw far less, and the box says how many can be joined end to end. MDL plans the runs so no outlet or circuit is overloaded.

What is the correct way to put lights on a Christmas tree?

Use lights that are listed by a recognized testing lab (the NEC requires holiday lighting to be listed; UL 588 is the standard for seasonal strings), and use indoor-rated strings inside and outdoor-rated strings outside, as the label says. CPSC says to check each set for cracked sockets, frayed cords and loose connections before use, to join no more than three sets of incandescent lights end to end, never to overload an outlet, and to water a live tree because a dry tree can burn through in under a minute. Turn the tree lights off when you leave the house or go to bed. Tree lights are a plug-in job, not electrician's work; MDL's part is the outdoor display and the outlets and circuits that feed it.

Do I need an outdoor outlet for Christmas lights, and does it need a permit in New Jersey?

The National Electrical Code requires outdoor receptacles at a home to be GFCI protected and to have a weatherproof in-use cover. In New Jersey, adding five or fewer outlets on circuits that can carry the load is minor work under N.J.A.C. 5:23-2.17A: no permit is needed before the work starts, but the contractor gives the local enforcing agency notice first, files the permit application within five business days, and the town inspects within three business days of the request. Fixr lists extra outlets at $120 to $200 each, not an MDL price.

How long can Christmas lights stay up?

The National Electrical Code (Article 590.3(B)) allows temporary power for holiday decorative lighting for up to 90 days; New Jersey adopts the 2020 NEC as its electrical subcode. HomeGuide says most installers recommend taking lights down by mid-January and return 2 to 4 weeks after New Year's Day. Lights left up all year should be commercial-grade and rated for continuous outdoor use.

How much do people charge to install permanent Christmas lights?

HomeGuide's cost guide puts permanent holiday lighting at $20 to $40 per linear foot, or $2,000 to $8,000 for 100 to 200 linear feet. Fixr puts the average at $3,000 to $3,500. Not MDL prices. These track systems are hardwired to a power supply and controller, which is electrician's work in New Jersey.

What are the downsides of permanent Christmas lights?

Cost up front (HomeGuide: $2,000 to $8,000 against $250 to $1,500 for a basic seasonal roofline), a visible track on the fascia in daylight, a controller and power feed that need a proper circuit, and a system tied to one brand's app. The upside is no ladder every November and lights that can change color for other holidays.

When should I book holiday light installation in Essex County?

Book in early November for a pre-Thanksgiving install. HomeGuide says most homeowners install after Halloween or in mid-November and take lights down in the first week of the new year, and that an install takes 2 to 5 hours, or up to 2 days for large properties. The earlier you book, the better your choice of dates.

Does MDL install Christmas lights on stores and offices?

Call 973.809.2339 with the address and the size of the storefront. Commercial displays run longer and draw more, so the first visit is about outlets, circuits and timers. For other commercial electrical work, see MDL's commercial electrical service page.

Sources

Where the rules, numbers and advice on this page come from.

All read October 28, 2026.

Next steps

Related services

Recessed

Recessed lighting installation

Indoor lighting work: recessed cans, dimmers and the circuits behind them, with New Jersey prices.

Learn more
Electrical

Electrical repair

Breakers that trip when the display comes on, dead outdoor outlets and wiring problems.

Learn more
Panel

Panel upgrades

When a holiday display, an EV charger and a generator all want more than the panel has.

Learn more
Commercial

Commercial electrical

Storefront and office lighting, outlets and circuits for a business display.

Learn more

Request service

Send MDL the service, town, and best callback number.

Use the form for planned service or call for urgent electrical, heating, or cooling help.